Friday (21/5/2010)
I continued with my assignment which is about 70% completed. I just need to draw single line diagrams on the process controls. Then later I refined the oil platform processes, control systems and also lubrication.
Thursday (20/5/2010)
Today, my supervisor was busy with his clients from Shell Sarawak. The submission date for the reports are today. He was also attending meetings after meetings with his co-workers and clients. I tried to complete my slides as there were much more to go. Pictures and words.
Wednesday (19/5/2010)
Today i felt lucky. An operation engineer from Shell was able to take 30 minutes out of busy schedule and gave me a talk about oil platforms and its processes involve when natural gas is extracted and send to the process plant. There were turbines and compressors involved, pipes and their beginning and ending destination and also seal-gas system for lubrication.
Tuesday (18/5/2010)
As usual, my supervisor is busy like any other day. I was left alone to complete my assignment.
Monday (17/5/2010)
I helped my supervisor to edit a new report. While doing that, i was able to see the format of composing a formal report. Once that is done, I continued with my presentation slides which were my assignment.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment