Thursday (6/5/2010)
After writing down all my main points on my scribbling book, i transfered them into Microsoft Powerpoint as my supervisor wants it in presentation format. After doing that, my supervisor checked on it and there was some remarks here and there but other than that it was a good progress.

Wednesday (5/5/2010)
My supervisor was busy today because the deadline for his project report is closing in. That's is why i continued with my assignment. I manage to find about the equipments needed in a compressor, the basic characteristics and surge in a compressor, and also the lubrication system needed to run the compressor smoothly.

Tuesday (4/5/2010)
Today will be the day i start on the assignment. I manage to get some thick textbooks about compressors from my supervisors and started processing them. I manage to find out the definition of a compressor, how it perform basically and also the many types of compressor. Looks like i'm going to have a big problem with the control systems for the surge control and others because it is a little bit complicated with many instrument to be taken into account.

Monday (3/4/2010)
First day of the week and i received my assignment from my supervisor. The assignment is to produce a presentation or training manual type booklet of a compressor. He included that this is a part of my internship evaluation. I was given more notes and pictures about compressors.

Friday (30/4/2010)
Fortunately it is a holiday for us to compensate for the labour day on saturday. Time to get some rest and well deserve sleep

Thursday (29/4/2010)
I attended a meeting together with my supervisor. The meeting's objective is to advice each discipline on how to write the change of design as a report. This is because there has been changes in the oil platform by their client, SHELL which is my supervisor's project. I manage to see how the report should be written, its procedures and also format.